Wallington main pic2.jpg

Re-Pointing 180m2 Chelsea (Riverside)

 

A perfect example of Extreme Access’s solutions to awkward access. Riverside building in need of complete repointing over the River Thames, our personnel accessed and completed within weeks.

Highbury grove main pic6.jpg

Highbury grove, Refurbishment

 

Working with Network Rail permission, our teams managed the access and repoint an inaccessible section by other means adjacent to rail tracks.

Wallington main pic2.jpg

Re-Pointing Residential flats (wallington)

 

Showing it’s not always the tall buildings which require our solutions, we were tasked with repointing the top 30 courses of brickwork throughout, to a large footprint building. Scaffold would have been a huge cost and disruption to residents for essentially small areas throughout these upper levels.