Using industrial abseiling we are able to access the hard to reach areas and expensive areas of the building for refurbishment and repair works. in this case replacement of Trespa panels on balcony cheeks for a new building look
Working on Trespa Panels was a new one for our teams, these panels are very sturdy and look great but are heavy and hard to dill.. so a work shop with templates was our first stage to make sure the job ran smoothly
Abseil technique was used through out the job due to the difficult and tight access, this was great news for the residents as most the time they didn't know works were going on.
We made bespoke Velcro nags for the lifting of the panels into place, making life a little easier and more importantly safer for the installations.
The removal of over 250 panels was surprisingly quicker than we thought, this stage of the job on two buildings was completed in less than a month.
A great project, once again testing our tradesmen knowledge and as a company resolving safely a difficult install. Including the re securing of the timber cladding on this building we were all happy with the results